Fees required by section 38-67 shall be paid before the director of engineering shall issue a permit under the provisions
of this article.
No such permit and inspection fee, however, shall be required in the event any person
is required to dig up, break, excavate, tunnel, undermine or in any manner disturb
the surface or subsurface of any street, lane, alley or public right-of-way if such
actions are required by the city through its repair, alteration or widening of any
such street, lane, alley or public right-of-way or any sidewalk and if such actions
are to be performed within the limits of the project.
(Ord. No. 62, § 7; Code 1961, §§ 36-56, 36-57; Ord. No. 3051-83; Ord. No. 3111-83,
§ 1; Ord. No. 3134-84; Ord. No. 3223-84)